Articles

Conditioning energy recovery ventilator mock-up is making progress

In development on March 26, 2011 by uiucsd

The students working on the HVAC system for the Re_home are mocking up the conditioning energy recovery ventilator in the full size building model.  This is a forced air distribution system and so they have the challenge of getting all the ducting routes established so as not to interfere with other appliances and systems like the water heater, washing machine, and plumbing vents.  Their goal is to do all of this while still trying to minimize pressure losses in the ducts to allow the system to run as efficiently as possible.  Keep up the good work team.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: